HMA-T Progress Spot Image 0811
Programming
- TBT
Still waiting for a draft of SPS specification.
ID | Risk Title | Severity | Likelihood | Risk Index | Risk Domain | Action and status |
1 | OGC spec SPS v1.0 delayed | high | low | 1 | requirements baseline | Participate to telecon and OGC TC to ensure the specification is on time |
Activities performed
- Weekly OGC telecon about sweCommon and SPS
- OGC TC meeting in Valencia
Activities performed
- TBT
Activities performed
- TBT
- Meeting with SPS editor during OGC TC in order to ensure that the SPS EO specification will be released soon
- Final version of the SPS EO specification
- Final version of the SPS library
- Spot Image SPS implementation with notifications mecanism
Catalogue
Project on time.
- No real client yet. Erdas client is available but very simple. SSE client needs to be updated for compliance with CSW 0.2.2. Client of Jérôme Gasperi has been installed but did not work.
- None
The following documents have been delivered:
- draft Spot Catalog HMA Interface ebRIM profile
Activities performed
- Managing rights to allow WS-Dali access by the proxy.
Activities performed
- Spot Catalog HMA Interface document finalized. Official version under approval in Spot Image. Draft uploaded on the twiki.
Activities performed
- Erdas framework has been succefully installed
- Erdas cots have been updated for compliancy with latests specifications
- Interface with WS-Dali has been implemented
- A preliminary version of the proxy has been deployed on a Spot Image server. This server will be accessible soon for testing purpose.
- Upload of official Catalog HMA Interface document on the twiki
- Deployment of the final version of the proxy
- Tests with the SSE client