HMA-T Progress GIM 0906

!Project Manager Assessment
The status of the project is nominal.

Key Problem List

  • None

Deliverables Table

  • HMAT-TN-0002-GIM-11: Technical Note on the application of the EO Profile of GML to the VITO EO product collections
  • HMAT-TN-0003-GIM-10: DRAFT Technical Note on the design of the HMA EO Product Catalogue for VITO CVB

WP1000 Project Management (GIM)

Activities performed

  • Discussions with ERDAS and Spacebel on light extension package approaches continuing. The propose multipart responses for the GetRecords operation appear not to be supported by Oracle BPEL.
  • Integration testing of SSE WebMapViewer with IT UK EO Profile of WMS Server, second round of tests.

Outcome and results

Problems and concerns

  • None.

Plans for next period

  • Normal work
  • Preparation of and assistance to the AR Meeting

WP2000 Application of EO Profile of GML for VITO Products (GIM)

Activities performed

  • Update of Document

Outcome and results

Problems and concerns

  • Airborne metadata samples not available as sensor is expected to only fly in June.

Plans for next period

  • Release of HMAT-TN-0002-GIM

WP3000 Integrate and demonstrate VITO HMA Catalog within HMA-I Prototype (GIM)

Activities performed

  • Updating of Design technical note
  • Analysis of compliance test reports of CNR.
  • Run of INTECS Compliance tests and analysis of those.
  • Failures can be grouped in 3 categories: issue with the CSW instance, issue with the tests and issues due to the use of extended schema. Issues are discussed with ERDAS and further discussed with Test implementors.
  • To prove that some issues are due to the use of the extended schema, a CSW will also be installed that only uses the eop schemas.
  • Develop Workflow and HMA portal files is ongoing

Outcome and results

Problems and concerns

Plans for next period

  • Rerun acceptance tests
  • Finalise portal integration

WP4000 Evaluation of EO Profile of GML and provision of metadata (VITO)

Activities performed

Outcome and results

Problems and concerns

Plans for next period


WP5000 Evaluation of EO Profile of GML and provision of “adapted� EO Proxy framework and support (ERDAS)

Activities performed

  • Discussions with GIM and others on compliance testsing

Outcome and results

  • Provision of new CSW installation to GIM

Problems and concerns

Plans for next period

  • Further support in development of VGT4Africa Catalog (in support of GIM)