HMA-FO Progress Task 2 1005

Project Manager Assessment

The status of the project is nominal.

Key Problem List

  • None

Deliverables Table

  • I65.1 HMA-FO-DMS-PMD-PMP01-E-R Project Management Plan. v1.0
  • I65.7 HMA-FO-DMS-QMD-PAP01-E-R Project Assurance Plan. v1.0
  • I51.2.2 Interface Control Document, I25.2 Specifications:
    • OGC 09-001 SWE Service Model. RFC
    • OGC 08-094 SWE Common Data Model. RFC
    • OGC 09-000 SPS 2.0. RFC
    • OGC 07-018 EO Extension for SPS. Draft
  • I51.1 HMA-FO-DMS-TEC-URD01-10-E-R Software system specification (SSS). v1.1
  • I51.2.1 HMA-FO-DMS-TEC-SRD01-10-E-R Software requirements specification (SRS). v1.1
  • I51.3.1 HMA-FO-DMS-TEC-ATP01-10-E-R Acceptance Test Plan. Awaiting confirmation that format is acceptable.
  • I51.4.1 HMA-FO-DMS-TEC-SDD01-10-E-R Software Design Document (SDD). Draft

WP1000 Project Management

Activities performed

  • Progress Meeting (and minutes, actions etc)
  • Coordination with subcontractors
  • Progress report updated
  • Coordination of EO Extension for SPS parameters review

Outcome and results

  • Ongoing

Problems and concerns

  • None

Plans for next period

  • General Project Management work


WP 2000: Completion of the SPS Specification

Activities performed

  • Final drafting of RFC candidate SPS Extension for EO.
  • Drafts of SPS 2.0 and SWE specifications are in RFC. Comments being discussed.

Outcome and results

  • Draft Specifications.

Problems and concerns

  • SPS 2.0 will need to be revised to match OGC Specification Model more closely. Need to ensure this is done in a timely fashion.
  • Identifier concept must be harmonised across all SWE specs, iGSI hope is to have everyone agree on use of http-URIs
  • SPS EO Specification has not received as many reviews as was hoped for. RFC version to be circulated widely to ensure it matches as many mission systems as closely as possible

Plans for next period

  • SPS EO Specification move to RFC agreed at or before June TC
  • SPS 2.0 and Swe Common RFC comments to be decided upon at June TC

WP 3000: Sensor Feasibility Reference Environment

Activities performed

  • Development work on SF Client and SF Server
  • Drafting architecture documents

Outcome and results

  • Internal release 1 of SF Server

Problems and concerns

  • None

Plans for next period

  • Internal release 2 SF Client (first UI) and SF Server
  • Architecture documents
  • Drafting of Test Plan (once format is decided)

WP 4000: EO Extension for SPS 2.0 - Conformance Testing

Activities performed

  • Discussion of suitable conformance classes for SPS specifications and level of detail in SPS ATS
  • Investigation of different TEAM engine options

Outcome and results

  • None (awaiting final ATS and answers on TEAM Engine)

Problems and concerns

  • TEAM engine situation complicated. Several versions exist.

Plans for next period

  • Get and set up TEAM engine
  • Begin development of ETS, based on ATS for EO Extension for SPS in RFC candidate

WP 5000: Additional Server Environments Demonstration

Activities performed

  • None

Outcome and results

  • None

Problems and concerns

  • None

Plans for next period

  • None

WP 6000: Warranty

Activities performed

  • None

Outcome and results

  • None

Problems and concerns

  • None

Plans for next period

  • None