ERGO PROGRESS 0808 INTECS
ERGO Progress August 2008: Intecs
The status of the project is nominal.
- None
ID | Risk Title | Severity | Likelihood | Risk Index | Risk Domain | Action and status |
1 | - | - | - | - | - | - |
2 | - | - | - | - | - | - |
The following documents have been delivered:
- none
Activities performed
- Normal work.
Outcomes and results
- none.
Problems and concerns
- none.
Plans for next period
- Normal work
Activities performed
- This WP has been completed.
Outcomes and results
- none.
Problems and concerns
- none.
Plans for next period
- This WP has been completed
Activities performed
- Completed integration of the plugin based interface repository. Now the interface repository can be queried by the Toolbox code and a description of the interface can be obtained.
- Started upgrading the web interface in order to use API exposed by the new interface repository.
Outcomes and results
- none.
Problems and concerns
- none.
Plans for next period
- Starting integration of EbRR code as soon it will become available.
Activities performed
- Some toolbox scripts for the EOLI metadata extraction have been prepared. These scripts perform a query on a predefined area looping on the start and end dates. The scripts currently extract the data in EbRim format because the provided end point does not support the getRepositoryItem operation.
- The scripts have been run and some data have been collected in EbRim(about 7000) over 2007 and 2008.
The team engine has been updated to support SOAp and the XML validation. The application currently does not work from command line. the problem will be investigated and the TEAM engine package will be published on the ERGO wiki.
Outcomes and results
- Preliminary test data provided to 4CT.
Problems and concerns
- The ebRIM2EOLI catalogue (deployed on infeo1.esrin.esa.int:8070) does not support the getrepositoryItem operation. Thus the test data currently are extracted in ebRim format. The ebRR tool allows the ingestion of these data even if the harvest OGC supports only GML. To test the compliance with the standards some data have to be provided also in GML format. Intecs will contact ESA (J. Martin) to check the status of the ebRIM2EOLI upgrade implementaion.
Plans for next period
- none