This progress report covers the activities performed in January 2010.

Project Manager Assessment

  • The status of the project is nominal.

Key Problem List

  • None

Deliverables Table

  • OSEOP Charter
  • OGC 06-141 V0.9.4 
  • OGC 06-141 V0.9.5 draft 1 
  • OGC 06-141 V0.9.5 draft 2
  • SOFTWARE DEVELOPMENT PLAN FOR HMA FOLLOW ON TASK 4 – ORDER (SDP)
  • SOFTWARE PRODUCT ASSURANCE PLAN FOR HMA FOLLOW ON (SPAP)
  • OPGW SOFTWARE REQUIREMENTS SPECIFICATION DOCUMENT (SRS)
  • OPGW SOFTWARE DESIGN DOCUMENT (SDD)
  • IMPROVEMENT OF SCENE SELECTION OPTIONS HANDLING TECHNICAL NOTE
  • ATS first draft
  • ATS V1.0

WP-10000: Project Management

Activities performed

  • WP-11000: Technical coordination
    • Preparation and attendance of progress meeting
  • WP-12000: Configuration Management
    • None
  • WP-13000: Quality Assurance
    • Review of OPGW SRS
    • Review of OPGW SDD
    • Review of Ordering ICD V0.9.5 draft 2
    • Review of ATS
  • WP-14000: OGC TC Meetings Attendance
    • Order SWG teleconference #3 held on 21/01/2010: finalized the approach for scene selection options
    • Preparation of Scene Selection Options Technical Note

Outcome and results

  • Progress Reports
  • Minutes of Meeting
  • Scene Selection TN

Problems and concerns

  • None

Plans for next period

  • Attendance to the HMA FO PR and AWG
    • Preparation of PR slides
    • Preparation of AWG slides

WP-20000: Engineering

Activities performed

  • WP-21000: Order Server Technical Specification and Architectural Design

Completed preparation of:

    • OPGW SRS – Software Requirements Specification
    • OPGW SDD – Software Design Document

Ready for PR.

  • WP-22000: HMA Ordering ICD Update
    • Prepared OGC 06-141 V0.9.5 draft 2 with closed the scene selection options issue

Ready for PR

  • WP-23000 : Order Server Acceptance Test Plan Definition
    • Not started yet.
  • WP-24000 : Test Suite Definition (ATS, ETS)
    • Completed preparation of ATS.
    • on-going activities on ETS

ATS Ready for PR.

  • WP-25000: HMA Ordering ICD contribution (con terra)
    • Further issues tracked on OGC issue tracker
    • PDR preparation

Outcome and results

  • OPGW SOFTWARE REQUIREMENTS SPECIFICATION DOCUMENT (SRS)
  • OPGW SOFTWARE DESIGN DOCUMENT (SDD)
  • OGC 06-141 V0.9.5 draft 2
  • ATS V1.0

Problems and concerns

  • ATS: Con terra pointed out the needs to keep limited the number of test cases in the ATS due to budget problems.
  • ETS: Ordering ICD has several async operation, but the TEAM engine at the moment does not support these operations

Plans for next period

  • Going on preparation of draft 3 of OGC 06-141 V0.9.5

WP-30000: Implementation and Testing

Activities performed

  • WP-31000: Order Server Design and Development
    • Not started yet.
  • WP-32000: SSE Integration Support
    • Not started yet.
  • WP-33000: Order Server Acceptance Testing
    • Not started yet.
  • WP-34000: Support to Order Server  Acceptance Testing
    • Not started yet.

Outcome and results

  • None

Problems and concerns

  • None

Plans for next period

  •  None

 

 

 