HMA-FO Progress Task 2 1006
Project Manager Assessment
The status of the project is nominal.
Key Problem List
- None
Deliverables Table
- I65.1 HMA-FO-DMS-PMD-PMP01-E-R Project Management Plan. v1.0
- I65.7 HMA-FO-DMS-QMD-PAP01-E-R Project Assurance Plan. v1.0
- I51.2.2 Interface Control Document, I25.2 Specifications:
- OGC 09-001 SWE Service Model. RFC
- OGC 08-094 SWE Common Data Model. RFC
- OGC 09-000 SPS 2.0. RFC
- OGC 07-018 EO Extension for SPS. RFC
- I51.1 HMA-FO-DMS-TEC-URD01-10-E-R Software system specification (SSS). v1.1
- I51.2.1 HMA-FO-DMS-TEC-SRD01-10-E-R Software requirements specification (SRS). v1.1
- I51.3.1 HMA-FO-DMS-TEC-ATP01-10-E-R Acceptance Test Plan. Draft, being converted to ECSS SVP format.
- I51.4.1 HMA-FO-DMS-TEC-SDD01-10-E-R Software Design Document (SDD). v1.0
WP1000 Project Management
Activities performed
- Progress meeting (and minutes, actions etc)
- Coordination with subcontractors
- Progress report updated
- Coordination of EO Extension for SPS RFC
Outcome and results
- Ongoing
Problems and concerns
- None
Plans for next period
- General Project Management work
WP 2000: Completion of the SPS Specification
Activities performed
- RFC candidate SPS Extension for EO.
- Comments on SPS 2.0 and SWE specifications are being discussed.
Outcome and results
- Specification Reviews.
Problems and concerns
- SPS 2.0 will need to be revised to match OGC Specification Model more closely. Need to ensure this is done in a timely fashion.
Plans for next period
- SPS EO Specification RFC comments to be received
- SPS 2.0 and Swe Common RFC comments to be taken in to docs (or rejected)
WP 3000: Sensor Feasibility Reference Environment
Activities performed
- Development work on SF Client and SF Server
- Drafting validation specification document
- Released v1.0 of SDD
Outcome and results
- Internal release 2 of SF Server and SF Client
Problems and concerns
- None
Plans for next period
- Test and demonstrate internal release 2 SF Client (first UI) and SF Server
- Architecture document review
- Drafting of Validation Spec
WP 4000: EO Extension for SPS 2.0 - Conformance Testing
Activities performed
- Discussion of suitable conformance classes for SPS specifications and level of detail in SPS ATS
- Investigation of different TEAM engine options
Outcome and results
- None (awaiting updates/consolidation of TEAM Engine)
Problems and concerns
- TEAM engine situation complicated. Several versions exist.
Plans for next period
- Get info from various partners to say which TEAM engine version to use
- Begin development of ETS, based on ATS for EO Extension for SPS in RFC candidate
WP 5000: Additional Server Environments Demonstration
Activities performed
- None
Outcome and results
- None
Problems and concerns
- None
Plans for next period
- None
WP 6000: Warranty
Activities performed
- None
Outcome and results
- None
Problems and concerns
- None
Plans for next period
- None