ERGO DELIVERABLES
ERGO Project Deliverables
The ERGO-TEMPLATE_RIDs_v0.01.xls file has to be used to generate RIDs on the project deliverables.
A single file has to be generated for each deliverable. The name of the file has to follow this rule: replace ERGO-TEMPLATE with
Thus for example the RIDs for the ERGO-PMP-1000-INT file issue 1 revision 2 should be includede in
ERG-ADD-3100-INT-1.2_RIDs_v0.01.xls
All the RIDs will be collected by Intecs and a single document will be provided to the document writer.
The documents below have been formally reviewed inside the project.
- ERGO-PMP-1000-INT, Project Management Plan, Issue 1, revision 2, 11/02/2009.
Intecs Deliverables
- ERG-ADD-3100-INT, EbRIM implementation with GeoNetwork and OMAR, Toolbox Architectural Design Document, Issue 1, revision 3, 22/05/2009.
ERGO-EBRR-ATP-4100-INT, ebRR Acceptance Test Plan, issue 1, revision 1. ERG-GEON-ATP-4100-INT, GeoNetwork Acceptance Test Plan, issue 1, revision 1. ERG-ATP-4100-INT, Toolbox Acceptance Test Plan, issue 1, revision 1. - ERG-SUM-3100-INT, ERGO Toolbox Software User Manual, issue 1, Revision 0, 30/04/09.
- ERG-SRD-2100-INT, ERGO Toolbox Software requirement Document, issue 1, revision 2, 30/04/09.
4CT Deliverables
ERGO-ebRR-ADD-4CT, ERGO ebRR Architectural Design Document, issue 1, revision 1 ERGO-ebRR-SUM-4CT, ERGO ebRR Software Installation and User Manual, issue 1, revision 1
GeoCat B.V Deliverables
- EbRim implementation with GeoNetwork Architectural design Document, issue 1, revision 1
- EbRim implementation with GeoNetwork Software Installation and User Manual, issue 1, revision 1
The documents below are old documents that have been formally reviewed inside the project.
Intecs Deliverables
- ERGO-PMP-1000-INT, Project Management Plan, Issue 1, revision 0, 05/05/2008.
- ERGO-PMP-1000-INT, Project Management Plan, Issue 1, revision 1, 06/12/2008.
- ERG-ADD-3100-INT, EbRIM implementation with GeoNetwork and OMAR, Toolbox Architectural Design Document, Issue 1, revision 0, 19/12/2008.
- ERG-ADD-3100-INT, EbRIM implementation with GeoNetwork and OMAR, Toolbox Architectural Design Document, Issue 1, revision 1, 16/01/2009.
- ERG-ADD-3100-INT, EbRIM implementation with GeoNetwork and OMAR, Toolbox Architectural Design Document, Issue 1, revision 2, 30/04/2009 (Clean document no revisions)
- ERGO-EBRR-ATP-4100-INT, ebRR Acceptance Test Plan, issue 1, revision 0, 30/04/09
- ERG-GEON-ATP-4100-INT, GeoNetwork Acceptance Test Plan, issue 1, revision 0, 30/04/09
- ERG-ATP-4100-INT, Toolbox Acceptance Test Plan, issue 1, revision 0, 30/04/09
4CT Deliverables
- ERGO-ebRR-ADD-4CT, ERGO ebRR Architectural design Document, issue 1, revision 0, 24/04/2009
- ERGO-ebRR-SUM-4CT, ERGO ebRR Software Installation and User Manual, issue 1, revision 0
GeoCat B.V Deliverables
- EbRim implementation with GeoNetwork Architectural design Document, issue 1, revision 0
- EbRim implementation with GeoNetwork Software Installation and User Manual, issue 1, revision 0